Foamer output, pump spring, overcap fit, bottle wall thickness, refill direction, decoration and carton packing can be tested together before bulk production.
Checks before sampling
Share formula viscosity, target dose and filling method before selecting the pump system.
Confirm actuator, overcap, dip tube or airless piston compatibility with the container.
Validate priming, output, leakage and formula contact materials with samples.
Build a useful RFQ
Confirm the exact packaging route
Share enough project context for the bottle, closure, decoration and packing requirements to be reviewed together.
Application or formulaCapacityClosure or componentDecorationQuantityDestination