Select output, actuator, lock, dip-tube length and collar with the exact bottle neck. Validate priming, leakage, formula compatibility, dip-tube reach and filling-line fit before approval.
Checks before sampling
Match the component to the exact bottle neck finish or approved finish drawing, not diameter alone.
Confirm formula viscosity, target output, actuator or spray pattern, dip-tube length and filling method.
Validate priming, leakage, lock or overcap function and transport handling with the final bottle system.
Build a useful RFQ
Confirm the exact packaging route
Share enough project context for the bottle, closure, decoration and packing requirements to be reviewed together.
Application or formulaCapacityClosure or componentDecorationQuantityDestination